SFR

Marseille (13)

 

Increase in power and securing of the data center power supply.

  • Installed electrical power of 20 MVA in N+1
  • Installed backup power of 6 MVA in N+1
  • Increase in backup power through the addition of a 2 MVA rotating generator and the associated MV cells.
  • Replacement of the redundant control PLC of the various scenarios
  • Normal/Backup
  • Requalification of a 300 m² dedicated room