Supply, installation, control and testing of traction, HV and LV energy equipment for the 5 electrical substations
Supply, installation, inspection and testing of LV equipment for the 19 passenger stations
Installation and connections of the Ground Power Supply (GPS) equipment
Modifications to the PCC to manage the entire new streetcar network
Extension of the power supply to the storage and maintenance center