CEA

Saclay (91)

 

Optimisation and securing of IT hosting of the IT buildings in the Saclay site. Rehabilitation of technical infrastructures, redevelopment of the existing IT room and creation of a new secure IT room.

  • Replacement of refrigeration plants, pumps and air conditioning and electrical cabinets. 
  • Replacement of the CTA [air treatment unit] with modifications made to the fresh air supply networks.
  • Use of an iced water system in parallel with the existing system.