Orange

Val de Reuil (27)

 

Design and construction of a 90 kV HVB double supply line to supply power to the Greenwich data centre.

  • Creation of two all trade 50 MVA 90 kV/20 kV HVB delivery substations.
  • 1,000 m of roads with road and utility networks
  • Two buildings of 250 m² on two floors for the two HVB substations
  • Two 90 KV/20 KV - 50 MVA transformers with static cooling (ONAN)
  • 20 KV - 12.5 MVA power supplies for building 1 delivery substations
  • Two GIS-type 90 KV shielded circuit breakers