- Execution studies of high currents, low currents, safety
- Electromagnetic protection
- BMS supervision, fire detection, fire extinguishing and safety installation for the building
- Finishing work
- Overall commissioning coordination (AOR) and commissioning of electrical installations
- Dual Room: 2 identical and redundant computer rooms
- IT floor area: 2 x 272 m²
- Energy efficiency: PUE < 1.5 at 75% load
- Resilience level: TIER III
- IT Power: 2 x 320 kW
- Long-term autonomy: 96 hrs (without refuelling)